East Gippsland Water replaced its existing generator and heat pumps with an 80kW 2G Agenitor biogas CHP system at the Bairnsdale Wastewater Treatment Plant. The solution generates renewable electricity and heat from biogas, supplies the site's energy requirements, and supports the organisation's renewable energy and emissions reduction targets.

CLIENT
East Gippsland Water

LOCATION
Bairnsdale, VIC

INSTALLATION
2G Agenitor 404a Biogas CHP
Gas Treatment and Carbon Filter

500MWh of renewable energy generated annually

485 tonnes of CO₂ emissions offset per year

Surplus electricity exported back to the grid

Recovered heat maintains optimal digester temperature

Overview

East Gippsland Water provides water and wastewater services across Victoria's East Gippsland region, and has committed to sourcing 100% renewable energy by 2025 and reaching net zero emissions by 2050. Wastewater treatment is energy-intensive, but the anaerobic digestion process used to treat waste also generates biogas that would otherwise be flared or vented. Capturing that biogas and converting it into electricity and heat on site lowers both energy costs and emissions at once. To progress these goals at its Bairnsdale Wastewater Treatment Plant, East Gippsland Water engaged Evo Energy Technologies to deliver a combined heat and power (CHP) solution built around the plant's existing biogas supply.

img-Bairnsdale-Project-24-a
power plant in Bairnsdale project

The system delivers:

The project involved the installation of a 2G Agenitor 80kW CHP unit, which uses biogas from the site's anaerobic digestion process to generate both electricity and heat. The system now powers the plant, provides all the thermal energy required by the digesters, and exports surplus energy to the grid.

The outcome

The CHP unit is expected to produce around 500MWh each year, enough to power 98 average Australian homes, while offsetting approximately 485 tonnes of CO₂ emissions annually. The project also forms part of East Gippsland Water's broader emissions reduction plan, contributing to a 44% reduction by 2025 and supporting its long-term climate goals.

Learn more about this project

Please enter your name.
Please enter a message.

Projects

Paving the way for a more sustainable future

Our portfolio highlights a dedication to innovative and sustainable energy solutions, along with a focus on delivering significant cost savings and operational efficiencies for clients.

Our specialist team of engineers create fit- for-purpose energy solutions to meet your specific requirements.

At the forefront of technology and precision, our world-class sales and engineering team deliver sustainable solutions that redefine industry standards

logo-evo-et-footer
Acknowledgement of Country

Evo Energy Technologies acknowledges the Traditional Owners of Country throughout Australia and recognises their ongoing connection to land, waters and community. We pay our respects to Elders past and present, and acknowledge the Jagera, Yuggera and Ugarapul peoples of the Yugara/Yagara Language Group, the Traditional Owners of the land on which our head office is located.

© 2023 Evo Energy Technologies All Rights Reserved.
Website designed by Balar Media Group

Policies

Connect

12 Gliderway St, Bundamba QLD 4304

Ph: 1300 012 471

To top